Waste Water Treatment Plant and Water Purifying Stations

   “HYDROSTROY” AD has built the following more important projects:

 

 

WESTE WATER TREATENT PLANT IN THE TOWN OF PLOVDIV-ENLARGEMENT AND RECONSTRUCTION

 

 

 

 

Capacity: 294 600 m³/24 hours.

Population of the settlement: 400 000 inhabitants.

Secondary Radial Settlers:

- diameter – 40 m;

- height – 5 m;

Pumping station with air blowers

- total capacity of the pumps - 4 500 l/sec;

- total air blowers capacity - 58 600 m³/hour;

 

 

WESTE WATER TREATENT PLANT IN THE TOWN OF ETROPOLE

 

Capacity: 18 250 m³/24 hours.

Built-up area – 10.00 decares

For equivalent population: 25 000 inhabitants.

Secondary Radial Settlers:

 - diameter – 25.00 m;

- height – 5.00 m;

Pumping station:

- total capacity of the pumps – 2 600 l/sec;

Conductive collector - Ø 1000 mm.

 

WESTE WATER TREATENT PLANT IN THE TOWN ROSTOV  ON  DON - RUSSIA

 

 

 

Capacity: 3 400 m³/24 h sewage and rain water.

Built-up area – 21 decares.

For equivalent population: 30 000 inhabitants.

Secondary Radial Settlers:

- diameter – 25.00 m;

- height – 8.50 m;

Pumping station with air blowers

- total air blowers capacity – 22 000 m³/hour;

 

 

WESTE WATER TREATENT PLANT IN THE TOWN OF TSAREVO

 

Capacity: 4 200 m³/24 hours.

Built-up area – 9 300 m²

For equivalent population:

- І stage – 14 500 inhabitants;

- ІІ stage – 65 000 inhaboitants.

Secondary Radial Settlers:

- diameter – 20.00 m;

- height – 4.50 m;

Pumping station with air blowers

- total capacity of the pumps - 50 l/sec;

 

 

WESTE WATER TREATENT PLANT IN THE TOWN OF MADAN

 

 

 

Capacity: 4 320 m³/24 hours.

Built-up area – 8 000 m²

Population of the settlement:

- І stage – 10 000 inhabitants;

Secondary Settlers:

- dimmensions – 35.00 m / 4.75 00 m;

- height – 5.00 m;

Pumping station with air blowers

- total air blowers capacity - 1200 m³/hour;

Sewer – D 800 mm.,

Duration of construction – 12 months.

 

 

WESTE WATER TREATENT PLANT IN THE TOWN OF ZLATOGRAD

 

 

 

 

Capacity: 4 320 m³/24 hours.

Built-up area – 8 000 m²

For equivalent population:

- І stage – 10 00 inhabitants;

Secondary Settlers:

- dimentions – 35.00 m / 4.75 m;

- height – 5.00 m;

Pumping station with air blowers

- total air blowers capacity – 1200 m³/hour;

Sewer Main – D 500 mm.,

Duration of construction – 12 months.

 

 

WATER PURIFYING STATION IN THE VILLAGE OF VRACHESH, MUNICIPALITY OF BOTEVGRAD

 

Capacity: 1 300 m³/24 hours (15.00 l./sec).

Total built-up area – 2 400 m².

Population of the settlement: 3 000 inhabitants.

WATER PURIFYING STATION YOVKOVTCI, MUNICIPALITY OF VELIKO  TARNOVO

Capacity: I-st stage - 70 000 m³/24 hours.

              II-nd stage – 175 000 m³/24 hours.

Total built-up area – 20 000 m².

Population of the settlement: 400 000 inhabitants.

 

 