WESTE WATER TREATENT PLANT IN THE TOWN OF PLOVDIV-ENLARGEMENT AND RECONSTRUCTION
Capacity: 294 600 m³/24 hours.
Population of the settlement: 400 000 inhabitants.
Secondary Radial Settlers:
- diameter – 40 m;
- height – 5 m;
Pumping station with air blowers
- total capacity of the pumps - 4 500 l/sec;
- total air blowers capacity - 58 600 m³/hour;
WESTE WATER TREATENT PLANT IN THE TOWN OF ETROPOLE
Capacity: 18 250 m³/24 hours.
Built-up area – 10.00 decares
For equivalent population: 25 000 inhabitants.
Secondary Radial Settlers:
- diameter – 25.00 m;
- height – 5.00 m;
Pumping station:
- total capacity of the pumps – 2 600 l/sec;
Conductive collector - Ø 1000 mm.
WESTE WATER TREATENT PLANT IN THE TOWN ROSTOV ON DON - RUSSIA
Capacity: 3 400 m³/24 h sewage and rain water.
Built-up area – 21 decares. For equivalent population: 30 000 inhabitants.
Secondary Radial Settlers: - diameter – 25.00 m;
- height – 8.50 m;
Pumping station with air blowers
- total air blowers capacity – 22 000 m³/hour;
WESTE WATER TREATENT PLANT IN THE TOWN OF TSAREVO
Capacity: 4 200 m³/24 hours.
Built-up area – 9 300 m²
For equivalent population:
- І stage – 14 500 inhabitants; - ІІ stage – 65 000 inhaboitants.
Secondary Radial Settlers: - diameter – 20.00 m;
- height – 4.50 m;
Pumping station with air blowers
- total capacity of the pumps - 50 l/sec;
WESTE WATER TREATENT PLANT IN THE TOWN OF MADAN
Capacity: 4 320 m³/24 hours.
Built-up area – 8 000 m²
Population of the settlement:
- І stage – 10 000 inhabitants;
Secondary Settlers:
- dimmensions – 35.00 m / 4.75 00 m;
- height – 5.00 m;
Pumping station with air blowers
- total air blowers capacity - 1200 m³/hour;
Sewer – D 800 mm.,
Duration of construction – 12 months.
WESTE WATER TREATENT PLANT IN THE TOWN OF ZLATOGRAD
Capacity: 4 320 m³/24 hours.
Built-up area – 8 000 m²
For equivalent population:
- І stage – 10 00 inhabitants;
Secondary Settlers:
- dimentions – 35.00 m / 4.75 m;
- height – 5.00 m;
Pumping station with air blowers
- total air blowers capacity – 1200 m³/hour;
Sewer Main – D 500 mm.,
Duration of construction – 12 months.
WATER PURIFYING STATION IN THE VILLAGE OF VRACHESH, MUNICIPALITY OF BOTEVGRAD
Capacity: 1 300 m³/24 hours (15.00 l./sec).
Total built-up area – 2 400 m².
Population of the settlement: 3 000 inhabitants.
WATER PURIFYING STATION YOVKOVTCI, MUNICIPALITY OF VELIKO TARNOVO
Capacity: I-st stage - 70 000 m³/24 hours.
II-nd stage – 175 000 m³/24 hours.
Total built-up area – 20 000 m².
Population of the settlement: 400 000 inhabitants.